Portable cabins & modular buildingsServing all seven emirates+971 54 199 8923

MANUFACTURING & DELIVERY

Made at our yard.
Ready for your site.

From the first layout to the final position, see how a Red Falcon cabin moves from manufacture to your project.

Discuss this requirement
Cleaned construction site with grey pavers
Cleaned construction site with grey pavers

BEFORE THE BUILD

First, we agree what you need.

Share the use, size, rooms, facilities, location and intended use. We develop the layout and confirm the quotation before manufacture.

Your requirement

The people, purpose and site.

Your layout

The rooms, openings and facilities.

Your quotation

The specification, price and agreed scope.

FROM YARD TO SITE

Follow the journey.

Five stages, from a cabin taking shape to placement at its destination.

  1. 01

    Manufactured at our yard

    Your cabin takes shape around the agreed layout. The frame, walls, roof and internal spaces are built and finished for the intended use.

  2. 02

    Finished and prepared for dispatch

    Doors, windows, finishes and the supplied internal facilities are completed and reviewed against the agreed scope before dispatch.

  3. 03

    Lifted onto the trailer

    The completed cabin is lifted onto a suitable trailer for the agreed delivery arrangement. Larger buildings travel as coordinated sections.

  4. 04

    Transported to your site

    The cabin travels from the yard to the project location. The delivery route, access and arrival arrangements are coordinated in advance.

  5. 05

    Positioned on prepared foundations

    At the destination, the cabin is lifted into position on prepared supports. Joined and G+1 sections are assembled and connected within the agreed scope.

Interior ceiling-grid installation during manufacture

BEHIND THE FINISH

The details that
make the space work.

Structure, partitions, openings and internal services are coordinated with the layout. Finishes and fittings are reviewed against the supplied specification before handover.

Explore construction & finishes

READY FOR DELIVERY

A prepared cabin.
A prepared site.

Confirm these arrangements before the delivery date.

Foundations & access

Suitable supports, approach routes and working space need to be ready. Foundation works can be quoted separately.

Site lifting

The client arranges the site crane, rigging, offloading, lifting and positioning.

Connections & handover

Power, water, drainage and the agreed assembly work are coordinated with the site team.

YOUR PROCESS QUESTIONS

What happens next?

Can site preparation happen while the cabin is being made?

Yes, where the programme allows. Foundations, access and external connections can be prepared while yard manufacture progresses. Confirm the design and responsibilities first.

Does a joined or G+1 building travel as one piece?

Larger modular buildings are manufactured and transported in sections, then positioned and assembled at the destination within the agreed scope.

Who arranges the crane at site?

The client arranges the site crane, rigging, offloading, lifting and positioning. Transport, foundations and assembly responsibilities are confirmed in the quotation.

Can you help after handover?

Discuss maintenance, repairs, modifications or suitable relocation as your requirements change. Available work depends on the cabin and site conditions.

INSIDE MANUFACTURE

From the steel base
to the internal details.

A closer look at different stages of cabin manufacture.

Steel base fabrication
Wall-frame assembly at the yard
Insulation installation within the wall frame
Internal partition framing
Interior ceiling-grid installation during manufacture
Sanitary installation in a toilet block

LET’S BUILD YOUR NEXT SPACE

Tell us what you need to build.

Have a drawing, a sketch or an idea? Share it with us and let’s develop the layout and supplied scope.

Your layoutOur manufactureYour destination
Enquire about this design